FAIR Consultation Request
Provide a few details about your First Article Inspection requirements. Complete the form below to request support with AS9102 FAIR preparation, documentation review, drawing ballooning, or package validation. We'll review your project and contact you to discuss the appropriate scope of services.

AS9102 First Article Inspection Support

FAIR Package Review

Whether you’re preparing a new First Article Inspection package or need assistance completing an existing one, our AS9102 support services help ensure documentation is organized, accurate, and ready for customer review. From drawing ballooning and Forms 1–3 to package validation and documentation review, we provide practical support throughout the FAIR process.

third party quality services

Quality Assurance Support

 

Quality support extends beyond completing AS9102 forms. We work with manufacturers to strengthen the processes surrounding First Article Inspection by reviewing documentation, verifying traceability, supporting inspection planning, and helping ensure inspection records align with customer and quality system requirements. Our objective is to provide practical support that promotes consistency, compliance, and confidence throughout the verification process.

Why Choose Us for FAIR Services

 

Principal and Lead Consultant Ronnie Lee Roberts II has supported Department of Defense (DoD) quality operations since 2017, contributing to programs associated with Patuxent River and Webster Field (NAWCAD/NAVAIR). His background includes hands-on experience within aerospace, defense, and manufacturing environments where inspection accuracy, controlled documentation, and process compliance are essential to successful First Article Inspection activities.

His experience includes supporting AS9102 First Article Inspection packages through inspection-to-print verification, engineering drawing review, dimensional inspection, documentation control, receiving inspection, production quality activities, and verification of technical and contractual requirements. Working within AS9100-regulated environments has provided a practical understanding of the documentation, traceability, and quality expectations required throughout the FAIR process.

Ronnie has served as a certified AS9100:2016 Rev D Lead Auditor (2022–2025), ISO/IEC 20000-1:2018 Lead Auditor (TPECS, 2023), and Certified CMMI® Associate (2025), with experience supporting CMMI-DEV Level 3 environments. His quality background includes internal auditing, objective evidence review, corrective action support, procedural compliance verification, and structured documentation practices that contribute to complete and organized First Article Inspection records.

Every FAIR support engagement is approached with attention to documentation accuracy, revision control, traceability, and reporting consistency. Whether assisting with drawing ballooning, AS9102 Forms 1–3, documentation review, or complete FAIR package preparation, our objective is to deliver professional, audit-aware documentation that supports customer confidence and compliance.

Loading...

Client Feedback

Reviews from Our Clients

"The most honest person I've dealt with in years, hands down!"
William Farr
Elite Maintenance
"The team at R.L. Roberts was great to work with. They are very knowledgeable and took our design needs, and made sure all of the details were accounted for and up to our expectations."
Randy Combs
Combs Prototype & Fabrication

FAQ

Most frequent questions and answers

AS9102 First Article Inspection is a standardized process used throughout the aerospace industry to verify that manufacturing processes can consistently produce a part meeting all engineering, design, and contractual requirements. The inspection results are documented using AS9102 Forms 1, 2, and 3.

We provide support for AS9102 documentation, including drawing ballooning, Forms 1–3 preparation, documentation review, package validation, traceability review, and overall FAIR organization. Services can be tailored to the specific needs of your project.

Yes. We can review completed or partially completed FAIR packages for documentation consistency, completeness, traceability, and alignment with AS9102 reporting requirements before customer submission.

Yes. We assist organizations that are preparing their first AS9102 package by explaining the documentation process and helping organize the required records.

Typically, we request the engineering drawing, drawing revision, part number, applicable specifications, customer requirements, inspection results (if available), and any supporting documentation related to the project.